The objective of the “Energy Efficiency in the Industry” project (“the project”) is to provide access to concessionary credit, incentivizing industrial companies in Bangladesh to extend and/or replace their equipment, machinery, production systems and processes with more energy-efficient substitutes.
To produce an overarching Port Development Roadmap and Legal and Regulatory Review in accordance with international best practices, with consideration given to global trends and drivers, as well as the regional and local environments.
Review of existing product lines & Insurance Distribution Network.
Objectives of this project include the implementation of the following activities: Updating the Revised Strategic Transport Plan for Dhaka for a total of 52,000 HHs from the selected Ward/ unions of the Dhaka, Gazipur, Narayanganj, Narshingdi (Rajuk and Outer Ring Road Area). Different valuable insights into the existing situation of urban transport in Dhaka city…
The purpose of the consultancy was to develop a concept of a Labor Market Information System (LMIS) for the Economic Zones in Bangladesh. The study answered the foundational questions to assess the feasibility and value-added of developing an LMIS for the EZs. Figuring out what information sources were relevant to integrate intoDescription of actual services…
MSL will be responsible to: Identify and draft relevant policies and regulations aimed to support the activities Harmonize existing work plans and draft regulations as well as recommend the development of public structures Develop relevant policies such as drafting Solid Waste Management Rules and Medical Waste Management Rules Regulate plastic design, labeling and take back
MSL will be responsible to: Develop a strategy to improve the railway corridor efficiency draft a roadmap for enhancing the role and efficiency of Zaminn Udd logisitcs platform
MSL (The Teacher Training and Assessment Firm (TTAF)) will be responsible to: Undertake a survey of selected SELD and SEF secondary schools to identify the capacity and training needs of secondary school teachers in 5 key subjects: English, mathematics, biology, chemistry and physics; Review the existing secondary education teacher training curriculum and prepare/revise training modules…
MSL will assist in the following: Review the baseline data of the RSTP, and through close consultation/coordination with the transport modeler, confirm the necessary surveys including any additional surveys through consultation with the team management group, ADB, and the DTCA Assist in the required traffic surveys with the required level of coverage and accuracy by…
MSL will be responsible for: Field level survey and analysis on indicator results Assess and validate the five (5) Impact, three (3) Outcome and three (3) Output indicators that were reported by the Fund. In addition, the consultant should also assess and validate the delivery of five (5) Output indicators (Reference Annex A, Indicators) that…
MSL will be responsible for the following tasks: Task 1: Advisory Support to RTSICP RTSICP Calendar of Meetings and Events RTSICP meeting proceedings/minutes Industry consultation report based on interview/survey Task 2: Advice on Operationalizing Road Maintenance Fund (RMF) Review report on Road Maintenance Fund Draft final report on Road Maintenance Fund operationalization Workshops /Knowledge sharing…
MSL will oversee the project and be the main interface with ACER to solve any project management related issues on a day-to-day basis. MSL will be in charge of: Coordination, delivery and quality assurance of the evaluation survey to ACER Liaise with the Ministry and relevant education stakeholders Oversight of survey and interview activities to…
MSL developed the sampling strategy, translated the questionnaire, and selected the interviewee for the questionnaire survey and KIIs.
MSL will develop capacity needs framework; identify relevant indicators, development of instruments, data collection and survey implementation plan; conduct data collection and capacity building activities; hold data validation and debriefing sessions.
MSL was responsible to: Coordinate with relevant officials of SSPS Programme, a2i project, and UNDP developing the M&E framework and plan for national social security integrated findings/outputs in conducting the whole assessment study. Perform system analysis of existing web-based M&E dashboard and platforms (internal systems, the web portal for public viewing, and the web portal…
The programme will be delivered in three phases: Phase 1: Research: gather and analyse data from companies and public dataset Network: engage with partner networks, key stakeholders, develop strategy, confirm key players, grow alliances Report: size opportunities for pollution mitigation through IS, stakeholder engagement. Phase 2: Network: engage with partner networks, key stakeholders, develop…
MSL conducted this survey to understand people’s stated preference (SP) for selecting a new transport mode under hypothetical conditions which cannot be predicted through analysis of the existing trip data, and to develop a mode choice model for travel demand forecast. In order to estimate future modal choice of MRT Line 2 the data collected…
MSL is responsible to: Review the current hardware and software systems of all the stakeholders of the capital market of Bangladesh. Analyze bottlenecks and process efficiency improvement for each of the stakeholders. Ensure data management and governance policies that should be effective, well-controlled with oversight and accountability across its lifecycle. Prepare draft institutional frameworks that…
MSL will assist IDCJ to implement the project in Bangladesh by providing all sort of local project management and logistical supports. MSL will also provide data collection services for the following area under the project: Regional Development, Special Economic and/or Industrial Zone Development in Bangladesh; Implementation and Operation Framework of Regional Development Program and/or Masterplan…
Carry out Initial Environmental Examination (IEE), Environmental and Social Impact Assessments (ESIAs) and prepare Environmental and Social Management Plans (ESMPs) for the project area covered under the LDDP. The major activities to be carried out will include, but not limited to the following: Review the ESMF Review the Project details Environmental and Social Screening Scoping…